GOVERNMENT & MILITARY

  • Presidio of Monterey Barracks
    Location: Presidio of Monterey
    General contractor: Sundt Construction, Inc.
    Summary:

    The work consisted of the design and construction of a new 320-person AIT Barracks located at the Presidio of Monterey, CA. This work was performed in two stages. Stage 1 included  project design along with survey/drawings of local environmentally sensitive trees, demolition of these trees, construction of a satellite parking lot, pedestrian access, and a utility run with cabling. Stage 2 included construction of a five-story barracks complex located on a small hillside parking lot and three additional parking lots. Berthing module layout includes entrance into a common kitchen/meeting area with a common toilet & shower room and two private bedrooms. Each berthing module will berths two persons.


    Read more...
  • FT POLK WT COMPLEX
    Location: FORT POLK, Fort POLK, LA 71459
    General contractor: SUNDT CONSTRUCTION, INC.
    Summary:

    This design-build project is a three-story, 67,346-square-foot building which houses 112 personnel. The barracks consists of 56 apartments. The units are a mixture of two-bedroom/two-bathroom and two-bedroom/one-bathroom modules. Each unit includes a living area and kitchen. The building includes a prominent main entrance, lobby, elevator and multi-purpose room. LEED Gold


    Read more...
  • FORT HOOD WIT BARRACKS
    Location: FORT HOOD, Fort Hood, TX 76544
    General contractor: SUNDT CONSTRUCTION, INC.
    Summary:

    Designed-Build 5-story, 192,720 s.f. apartment-style Warriors in Transition (WT) Barracks, 160 apartments that can house up to 320 soldiers. LEED Silver


    Read more...
  • THE VILLAGES AT FORT IRWIN
    Location: Bldg. 826 5th Street & South Loop, FORT IRWIN, CA 92310
    General contractor: CLARK REALTY BUILDERS, LP
    Summary:

    715 new homes in four different neighborhoods at Fort Irwin for Soldiers and their families.


    Read more...
  • SAN DIEGO MILITARY FAMILY HOUSING - PHASE III HISTORIC RENOVATIONS
    Location: Multiple Sites, San Diego, CA
    General contractor: CLARK REALTY BUILDERS, LP
    Summary:

    San Diego Family Housing – Phase III 128 New Homes, 66 Renovated Homes Including 58 Historic Homes, and 1,187 Homes Requiring Work and Repairs across various Sites in San Diego


    Read more...
  • STUART MESA, MCB CAMP PENDLETON, PHASE VI- PPV 172 FHU
    Location: 201021 WIRE MOUNTAIN ROAD, CAMP PENDLETON, CA 92058
    General contractor: HUNT BUILDING COMPANY
    Summary:

    172 Family Housing Units, 86 Buildings & Community Center at MCB Camp Pendleton.


    Read more...
  • N.A.S. WHIDBEY ISLAND - 200 FHU
    Location: 3730 N. CHARLES PORTER AVENUE, OAK HARBOR, WA 98278
    General contractor: SUNDT CONSTRUCTION, INC.
    Summary:

    200 Family Housing Units at NAS Whidbey Island, Washington.


    Read more...
  • MONTEREY BAY MILITARY HOUSING
    Location: 171 Monterey Road, MONTEREY, CA 93955
    General contractor: CLARK REALTY BUILDERS, LP
    Summary:

    Construct military family housing communities for the Presidio of Monterey (POM) and the Naval Postgraduate School (NPS). The development, with locations at the Ord Military Community on the former Fort Ord and La Mesa Village in Monterey, consists of approximately 2,400 existing, renovated, and new houses along with multiple clubhouses, ball fields, and recreation centers with indoor pools.


    Read more...
  • TINKER AIR FORCE BASE FAMILY HOUSING & COMMUNITY CENTER - 398 FHU
    Location: 5643 TWINING DRIVE, TINKER AFB, OK 73145
    General contractor: BALFOUR BEATTY CONSTRUCTION
    Summary:

    Privatized Housing at Tinker AFB, OK - 398 Family housing units & Community Center


    Read more...
  • TRAVIS AIR FORCE BASE FAMILY HOUSING & COMMUNITY CENTER - 358 FHU
    Location: TRAVIS AFB, CA 94535
    General contractor: BALFOUR BEATTY CONSTRUCTION
    Summary:

    Privatized Housing at Travis AFB, CA - 358 FHU & Community Center


    Read more...
  • GATEWAY VILLAGE - 460 FHU
    Location: 2741 MENDONCA DR, SAN DIEGO, CA 92110
    General contractor: CLARK REALTY BUILDERS, LP
    Summary:

    Replacement of the 545-unit Gateway Village community with 460 new townhomes. The homes were originally constructed in 1941 and consist of three and four-bedroom units that are each approximately 1,784 SF.


    Read more...
  • FORT CARSON - OLD HOSPITAL - 404 FHU
    Location: 1864 HOSPITAL STREET, FORT CARSON, CO 80913
    General contractor: CENTEX CONSTRUCTION
    Summary:

    Fort Carson Family Housing consisted of 440 new, state-of-the-art homes in three communities.


    Read more...
  • DESIGN-BUILD BACHELOR ENLISTED QUARTERS P1109 & P1113
    Location: MCS CAMP PENDLETON, CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    5-Story Bachelor Enlisted Quarters with a total of 430 rooms with private bathrooms.


    Read more...
  • BACHELOR ENLISTED QUARTERS - P-991 CHAPPO AREA 22
    Location: MCS CAMP PENDLETON, CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design/Build BEQ P-991, Chappo Area 22, Marine Corps Base Camp Pendleton.


    Read more...
  • BACHELOR ENLISTED QUARTERS - P-015
    Location: MCS CAMP PENDLETON CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design and construction of a multi-story reinforced concrete masonry Bachelor Enlisted Quarters (BEQ) building. The building includes 200 rooms with semi-private bathrooms in the standard Marine Corps 2+0 room configuration.


    Read more...
  • AIRCRAFT MAINTENANCE HANGARS P447, 9447A, P460 (N62742-09-D-1172)
    Location: 2114 N. Ordnance Loop, YUMA, AZ 85365
    General contractor: DCK NORTH AMERICA, LLC
    Summary:

    Construction of a new aircraft maintenance hangar, aircraft taxiway and parking apron.  This project also constructs replacement facilities for the indoor simulated marksmanship trainer and gas chamber due to the demolition of building 36, 39 and 40.  P447A provides construction of a new F-35 JSF compliant aircraft maintenance hangar.  This project will include the aircraft parking apron adjacent to the hangar and taxiway connections.  P460 provides construction of a new Aircraft Maintenance Hangar, aircraft taxiway and parking apron that are JSF compliant.


    Read more...
  • FORT SAM HOUSTON WARRIORS IN TRANSITION BARRACKS
    Location: FORT SAM HOUSTON FORT SAM HOUSTON TX
    General contractor: SUNDT CONSTRUCTION, INC.
    Summary:

    Design & Construction of a Warriors In Transition Barracks with a total of 360 beds and site development. LEED Silver


    Read more...
  • QUALITY OF LIFE BEQ & DINING FACILITY BP#4
    Location: TWENTYNINE PALMS TWENTYNINE PALMS CA 92278
    General contractor: STRAUB/MARTIN HARRIS JV, INC.
    Summary:

    Design & Construction of Bachelor Enlisted Quarters and Parking Structure. LEED Gold


    Read more...
  • BEQ PACKAGE 6, BEQ P-357 & P-1114 MARGARITA AREA 33
    Location: MCS CAMP PENDLETON CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design and construction of Bachelor Enlisted Quarters (P357, and P1114) at Marine Corps Base, Camp Pendleton, CA. The BEQ's will house a total of 1,148 marines and the facilities will provide standard 2+0 room configuration sleeping rooms with private bathrooms.


    Read more...
  • BEQ P-206 & P-028 ENLISTED DINING FACILITY
    Location: MCS CAMP PENDLETON CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design/Build BEQ and Enlisted Dining Facility, 41 Area, Marine Corps Base Camp Pendleton.


    Read more...
  • BACHELOR ENLISTED QUARTERS - BEQ P-440
    Location: MCAS YUMA YUMA, AZ 85365
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design and construction of a multi-story reinforced concrete masonry Bachelor Enlisted Quarters (BEQ) building. The building includes 150 rooms with semi-private bathrooms in the standard Marine Corps 2+0 room configuration.


    Read more...
  • BACHELOR ENLISTED QUARTERS- P-098
    Location: MCS CAMP PENDLETON CAMP PENDLETON, CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design/Build BEQ, San Mateo (62) Area, Marine Corps Base Camp Pendleton.


    Read more...
  • BACHELOR ENLISTED QUARTERS at MCAGCC - P605
    Location: TWENTYNINE PALMS TWENTYNINE PALMS, CA 92278
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design-Build construction of a multi-story, concrete reinforced masonry building, concrete foundation and floors, standing seam metal roofing to provide 195 rooms with semi-private bathrooms in a standard 2X0 (2-person) room configuration.


    Read more...
  • BACHELOR ENLISTED QUARTERS HEADQUARTERS AREA 13 - P-044
    Location: MCS CAMP PENDLETON CAMP PENDLETON,CA 92055
    General contractor: HARPER CONSTRUCTION CO.
    Summary:

    Design and construction of a multi-story reinforced concrete masonry Bachelor Enlisted Quarters (BEQ) building. The building includes 200 rooms with semi-private bathrooms in the standard Marine Corps 2+0 room configuration.


    Read more...
  • MURPHY CANYON - 992 FHU
    Location: 3100 SANTO RD SAN DIEGO, CA 92124
    General contractor: CLARK REALTY BUILDERS, LP
    Summary:

    Development and renovation of 992 homes and construction of four new homes in the Murphy Canyon neighborhood in the Tierrasanta community of San Diego consist of three- and four-bedroom single-family homes and multifamily units.


    Read more...