HOSPITALITY & ASSISTED LIVING

  • Hampton Inn & Suites and Towne Place Suites
    Location: Liberty Station San Diego
    General contractor: Roy Anderson Corp Contractors
    Summary:

    Hotel #1 - Hampton Inn & Suites - (4) Story – 181 Guestroom Hotel, approx. 96,795 SF. Type VA Construction.  Hotel #2 - Townplace Suites – (5) Story – 222 Guestroom Hotel, approx. 133,316 SF. Type IIIA Construction.


    Read more...
  • The Glen at Scripps Ranch
    Location: San Diego
    General contractor: W.E. O'Neil
    Summary:

    The Glen at Scripps Ranch is a large senior housing development.  Atlas Mechanical performed work on the following buildings: GARDEN TERRACES A thru C - 86,000 sf, 48 Units Two Story Buildings, on Grade VILLAS #1 thru 33- 62 Units, 1-Story Buildings, on Grade GARGES, CARPORTS and GUARDHOUSE - 8 Garages, 21 Carports and 1 Guardhouse.  The development also includes RESIDENTIAL APARTMENTS – 425,000 sf 3-story/4-story 295-unit  COMMONS BUILDING – 44,000 sf, 2 Story Building, POOL BUILDING – 27,000 sf, 2 Story Building, and MAINTENANCE BUILDING - 25,000 sf Maintenance Building.


    Read more...
  • Belmont Village
    Location: San Diego
    General contractor: Suffolk Construction
    Summary:

    17 Story high-rise includes 180 senior living units. The ground level will include various indoor and outdoor amenity spaces. The lobby, great room, and bistro area is at the entrance of the building while a dining area and kitchen share the remainder of the first level. A large garden court is placed on the north end of the property that includes seating, dinning space and a pool area for tenants to use. A small covered garden is adjacent to the bistro area as well. The senior living units are placed on levels 2 through 17 with small outdoor terraces on levels 2, 3, 4, 5, 9, 11, and 17. The project includes a three level subterranean parking garage. The first level of parking also includes two enclosed spaces one for back of house space for building operations and the second is a skilled nursing facility that will be used by the neighboring high-rise and be accessed by a separate elevator. 


    Read more...
  • Furnace Creek Resort
    Location: Death Valley, CA
    General contractor: GE Johnson/Kitchell, a Joint Venture
    Summary:

    Furnace Creek Inn and Ranch Resort in Death Valley National Park included updating all of the Inn's public spaces, building a new spa treatment facility and addition of 15 new casitas (30 total rooms). The Ranch includes a larger scale improvements centering around a "Town Square" new restaurant complex, new retail/grocery store, Town Hall (which houses the reception and check-in areas along with an ice cream parlor), maintenance building and offices, and site utility improvements.


    Read more...
  • Hotel Figueroa Renovation
    Location: 939 S. Figueroa Street, Los Angeles, CA
    General contractor: Shangri-La Construction
    Summary:

    The Hotel Figueroa Renovation located in Downtown Los Angeles is a historic renovation from its original 1926 Spanish Colonial decor. The project totals 109,940 square feet throughout three structures each with 12 levels above grade and one level below grade. It includes 268 hotel keys including 63 suites. Amenities include a large lobby social area, an outdoor pool, five restaurants and bars, and in-room dining. 


    Read more...
  • BRIGHTON GARDENS ASSISTED LIVING
    Location: 12791 ALAMEDA PARKWAY, LAKEWOOD, CO 80228
    General contractor: KOLL CONSTRUCTION COMPANY
    Summary:

    Brighton Gardens Assisted Living and Long Term Care Community.


    Read more...
  • BLUEGREEN PREVIEW CENTER T.I.
    Location: 372 E. TROPICANA AVENUE LAS VEGAS NV 89169
    General contractor: LEDCOR CONSTRUCTION, INC.
    Summary:

    7-story Timeshare Hotel totaling 465,000 sq.ft. The facility consists of 478 suites, 45,000 sq. ft. of ground floor retail, an enclosed elevated fourth floor swimming pool, and other resort amenities.  


    Read more...
  • SUNRISE ASSISTED LIVING AT SHERIDAN, PALO ALTO - 182 UNITS
    Location: 2701 EL CAMINO REAL PALO ALTO, CA 94306
    General contractor: W.E. O'NEIL CONSTRUCTION COMPANY
    Summary:

    Sunrise in Palo Alto, California, offers personalized senior living services and continuing care options that enable seniors to live life on their own terms.


    Read more...
  • RANCHO MIRAGE ASSISTED/INDEPENDENT LIVING, ALZHEIMER'S MEMORY CARE - 145
    Location: 72750 COUNTRY CLUB DRIVE RANCHO MIRAGE, CA 92270
    General contractor: MBK CONSTRUCTION
    Summary:

    Assisted Living, Independent Living and Alzheimer's Memory Care facility located in Rancho Mirage.


    Read more...
  • HILTON GARDEN INN
    Location: 17240 BERNARDO CENTER DRIVE SAN DIEGO, CA 92128
    General contractor: DAVIS REED CONSTRUCTION
    Summary:

    210-unit, three-story hotel with 90-stall subterranean garage, pool, full-service kitchen and meeting rooms.


    Read more...
  • MARRIOTT RESIDENCE INN - 270 ROOMS
    Location: 370 HUGHES CENTER DRIVE LAS VEGAS, NV 89169
    General contractor: W.E. O'NEIL CONSTRUCTION COMPANY
    Summary:

    270 rooms, Ten-story hotel and conference center. The suites feature separate living and sleeping areas and fully equipped kitchens.


    Read more...
  • RITZ CARLTON AT MARINA DEL REY
    Location: 4375 Admiralty Way, Marina Del Rey, CA 90292
    General contractor: DOUGLAS E. BARNHART
    Summary:

    Major renovation of this Marina Del Rey property including Lobby, Restaurant with kitchen, bars and Guest rooms.


    Read more...